Subjects in the process of installation, assembly department performed "MaxiBud Engineering":
1. Residential complex «RiverStone», Kiev, Dnepovskaya naberezhnaya, Str. 14
Design, assembly, production, installation transparent structure and ventilated facades. (45 000 sq.m.)
2. Administrative and hotel center, Hotel «Ramada Encore», Kiev, Stolichnoe shosse, 103.
Design, assembly, manufacture, installation SVF (14 000 sq.m.).
3. Hotel «CityHotel», Kiev, B. Khmelnitsky Str. 56.
Design, assembly, production, installation transparent structure and ventilated facades. (3950 sq.m.)
4. International terminal of the airport "Kiev" (Zhuliany), Kiev, Medovaya Str.
Design, assembly, production, installation transparent structure and ventilated facades. (9850 sq.m.)
5. LCD "Prestige Hall", Kiev, A.Barbyusa Str., 37.
Design, assembly, production, installation transparent structure and ventilated facades. (6875 sq.m.)
6. Residential complex with underground parking, Kiev, Geroev Stalingrada , 2
Design, assembly, production , installation transparent structure. (4400 meters).
7. The residential complex "Crystal Park", Kiev, Pobedy 42.
Design, assembly, production, installation transparent structure and ventilated facades. (9000 sq.m.)
8. Retail and entertainment complex "AGROMAT" Academika Bulakhovskogo Str., 4.
Design, assembly, production, installation transparent structure(5512 meters).
9. Residential private house, Kiev region, v. Romankiv.
Design, assembly, production, installation transparent structure and ventilated facades. (1100 sq.m.)
10. Residential private house, Kiev region.
Design, assembly, production, installation transparent structure and ventilated facades. (1 700 sq.m.)
|
|